Kitchen Renovation in Scarborough, Built by One Accountable Team

From a cosmetic refresh to a full gut renovation with a new layout — design, permits, and construction handled by a licensed general contractor based right here in Scarborough.

What's Included

Every Part of the Kitchen, Handled

Whether you're updating cabinets and countertops or reworking the whole layout, we scope the project so nothing gets missed — and nothing gets handed off to a trade you have to manage yourself.

Custom & semi-custom cabinetry
Countertops & backsplash
Layout changes & wall removal
Electrical & lighting upgrades
Plumbing relocation
Flooring
Kitchen islands & seating
Permit drawings & applications
Why Vanguard

Local, Licensed, Accountable.

01

Based in Scarborough

We're not driving in from out of town — we're local, and most of our new clients come from referrals of people we've already built for.

02

Licensed, Insured & WSIB Covered

Full coverage on every project, so your property and our crew are protected throughout.

03

Permits Handled End-to-End

If your kitchen renovation needs a permit from the City of Toronto, we manage the full application — you don't chase paperwork.

04

Fixed-Scope, Transparent Quotes

Detailed quotes with no hidden costs or end-of-project surprises.

Common Questions

Kitchen Renovation FAQ

Do I need a permit to renovate my kitchen in Scarborough?

A permit is required if you're moving plumbing or gas lines, changing electrical service, or altering structural walls (e.g. opening a kitchen to a living room). Cosmetic updates — cabinets, countertops, flooring, backsplash — generally don't require one. We assess this during the site visit and handle the full City of Toronto application if it's needed.

How long does a kitchen renovation take?

A cosmetic refresh (cabinets, counters, flooring) typically runs 2-4 weeks. A full gut renovation involving layout changes, electrical, and plumbing usually takes 6-10 weeks, depending on permit timelines and material lead times. We give you a specific schedule after the site assessment.

Can you keep my kitchen partly usable during the renovation?

For cosmetic and mid-scope projects, yes — we sequence work to keep water and some counter space available where possible. For full gut renovations involving plumbing and electrical rough-in, the kitchen will be out of commission for part of the project; we'll tell you exactly which weeks upfront so you can plan.

Do you handle the design as well as the construction?

Yes. Our team handles layout planning, cabinetry and finish selection support, and any required engineering drawings, so you're working with one accountable team from concept through final walkthrough.

Ready to Start Your Kitchen Project?

Book a free feasibility call — most clients get a clear direction within 30 minutes.

Request a Detailed Quote
Also serving North York, Toronto East, Markham, Pickering, Ajax, Whitby, Oshawa, Richmond Hill, Vaughan, Brampton & Mississauga.