Second-storey additions, rear extensions and garden suites for Toronto homeowners and investors. We handle the design, the structural engineering and the City of Toronto permit process, then build it.
In Toronto, an addition is approved before it is built, and the order matters. This is the path we follow, and we run all of it.
We check what the City's zoning rules allow on your lot: height, setbacks and lot coverage. This happens first, at the feasibility call and site assessment, so you know early whether your design works as-is.
Architectural drawings and structural engineering are prepared together. A second storey needs an engineer to confirm the existing foundation and walls can carry it.
If the design falls short of zoning, it can sometimes be brought to the City's Committee of Adjustment for a minor variance. It is not needed on every project, and it adds time when it is.
We submit the building permit application to the City of Toronto with the engineering drawings, answer the City's questions, and manage the application through to the permit.
Once the permit is issued, we build, with City inspections at the required stages, and close the permit out at the end.
Some properties need extra approvals: heritage-designated homes, and properties near ravines, watercourses or the Scarborough Bluffs, for example. We check for this at the feasibility stage so it does not surprise you halfway through.
How long the City takes. Toronto Building reviews a complete permit application for a house within 10 business days. The clock only starts once the application is complete, which includes the zoning certificate (ZAP). That step, and any revisions the plans examiner asks for, are what usually stretch the overall timeline, so we build them into your schedule from day one.
A common choice for a single-storey house on a lot with little room to grow outward. Full structural framing, engineering and permits, with the exterior finished to match the existing home.
More space at ground level, where setbacks and lot coverage leave room for it.
A separate secondary structure, usually for family or a tenant. Whether it is allowed depends on the lot, so it is one of the first things we check. Our guide to building a garden suite covers zoning, design and the build itself.
Comparing this with moving? Read home addition versus buying a new home for the cost, timeline and long-term value side of that decision.
An investor client bought a single-storey bungalow in Toronto's Scarborough area for $200,000. Our scope was a complete second-storey addition: new structural framing, a full building permit and engineering package with the City, and a top-to-bottom interior renovation with a new open-concept main floor and kitchen. Construction came to roughly $200,000, and the finished home sold for $650,000, before the investor's own selling and carrying costs.


That is one project, not a price list. Every lot and scope is different. Read the full East Street case study.
We're local, and most of our new clients come from referrals of people we've already built for.
Full coverage on every project, so your property and our crew are protected throughout.
We've never had a permit rejected — our drawings are done right the first time, which keeps your timeline on track.
Detailed quotes with no hidden costs or end-of-project surprises.
Yes. Any addition that increases your home's footprint or adds a storey requires a building permit from the City of Toronto, along with structural engineering drawings. We prepare the drawings and handle the application as part of the project.
It is sometimes possible to apply for a minor variance, which is decided by the City's Committee of Adjustment. That adds time to the schedule, so it is worth confirming early. We assess your lot during the feasibility call and tell you honestly what is possible.
It depends on your lot: its size, its setbacks and the zoning that applies. We assess eligibility during the feasibility call and handle the design and permit process if the lot qualifies.
From permit application to move-in, a second-storey addition typically takes 4-7 months: roughly 6-10 weeks for design and permit approval, then 3-5 months of construction depending on scope. We give you a specific schedule after the site assessment.
Yes. We're based in Scarborough and build across Toronto and the GTA, including North York and Toronto East.
Our office is in Scarborough, and we build across Toronto and the GTA. If your project is in Scarborough itself, see our page on home additions in Scarborough. Scarborough is part of Toronto, so the permit process is the same, and that page covers what decides the cost and how a build is sequenced.
To get started, book a feasibility call. It helps to have your property survey or site plan if you have one, photos of the house and yard, and a sense of what you need the space for.
Book a free feasibility call — most clients get a clear direction within 30 minutes.
Request a Detailed Quote